Use a mixture of filters or keywords to find documents and resources by department, type or topic.
For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.
Last updated: 03/08/2024
For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.
Last updated: 03/08/2024
The form is used to calculate an actual occupant load in educational spaces governed by the Texas Educational Agency (TEA) rules that limit maximum class size to approximately 2/3rds of that specified by the IBC occupant load factor identified in Table 1004.1.2 for educational spaces.
Updated 01-01-2023
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2024
Storm plan review checklist for residential projects with tract size of less than 15,000 square feet
Last updated: Feb. 17, 2022
This acknowledgement must be completed by the licensee and submitted to the Fire Marshal’s Office prior to scheduling a final inspection.
Last updated: 01/01/2023
The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.
Updated: 04/20/2023
This is a permit application for Boilers within the city limits of Houston, Texas.
Last updated: 12-01-2023
Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.
Updated: 4/10/2024