Use a mixture of filters or keywords to find documents and resources by department, type or topic.

12-03-R Generator location requirements for single family residence

Generator location requirements for single family residence.

18-02-R Two family dwelling vertical separation

Two family dwelling vertical separation

22-03-R, 1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall)

1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall) 

Updated 01/17/2023

22-04-R, 1-Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall)

1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall) 

Revised 01/17/2023

18-04-R Residential Garage Dwelling Separation
12-08-R Example site plan for drainage requirements

Example site plan for drainage requirements.

Acknowledgement of Fire Extinguishing System (CE1306)

This acknowledgement must be completed by the licensee and submitted to the Fire Marshal’s Office prior to scheduling a final inspection.

Last updated: 01/01/2023

Solar Ready Example DWG 22-01-R

This example drawing identifies what is needed on the roof plan to be compliant with the solar-ready provisions. This is drawing for reference only.

Last updated Jan. 17, 2023

16-06-R Appendix L Illustration

Appendix L Illustration

19-05-R Two family dwelling horizontal separation

Last Updated 10/10/2019