Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Storm damage repair guidelines for single-family homes and duplexes in Spanish.
Last updated: 9/20/2017
The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.
Revised 08/15/2023
This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.
Last Updated: 01/01/2023
Requerimientos para Permisos de Construcción e Información (Carport requirements brochure in Spanish)
Permitting and inspection information for house moving.
Last updated: 12-11-2023
This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.
Last updated: 2/13/2019
This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.
Last updated: 2/12/2019
This guide provides the requirements for the placement and reconnection of manufactured homes.
Last updated: 01-01-2024
This brochure is intended to provide a very high level overview of the commercial building permit process.
Last updated: 1/1/2019