Large Meter - Cut, Plug and Abandon

HPWUA1014
Plan Review
Required
Inspection
Required
Renewal
Not Required
Inspection fee
$408.62
Valid Period
permanent
Processing Time
35 to 40 minutes
APPLY QUESTIONS
Houston Public Works

1002 Washington Ave., 3rd Floor
Houston, TX 77002

832.395.9466
8 am to 3 pm

About

What is a large meter?

Large compound meter

A large compound meter is a water meter that is 3 inches or larger, and used for domestic and fire services. These may service a permanent structure that can be used for multi-family, commercial, or government.

Fire only large meter

A fire-only large meter is a water meter that is 3 inches or larger, and serves fire only. These may service a permanent structure that can be used for multi-family, commercial, or government.

Irrigation large meter

An irrigation large meter is a water meter that is 3 inches or larger, and services a property for landscape irrigation or livestock purposes only.

 

When do I apply for a large water meter?

Cut, plug, and abandon meter

If you no longer require a water meter and need to remove an existing large water meter from the property, you will apply for a cut, plug, and abandon of your large water meter.

If you no longer require a water meter and need to remove an existing large water meter from the property, you will apply for a cut, plug, and abandon of your large water meter.

After Approval

Begin Customer Account Services review and pay for permit.

Conditions & Exceptions

For more information regarding domestic accounts or ownership change, please contact Customer Account Services at 713.371.1400.

Statutory Authority
What You Need
  • Large Job Application - Meters
  • Surface Restoration Bond
  • Maintenance Bond
  • Meter number or account number

Note: Please read the Large Meter Permit Requirements to identify the required documents for your large meter request. There are different requirements and documents that will need to be provided based on project classification. 


Apply Online
  1. Review the Large Meter Permit Requirements document
  2. Fill out Large Job Application - Meters and Commercial Service Application
  3. Email the application and required documents to [email protected]. Please put "Large Job Request" in the email subject line.

Note: Please read the Large Meter Permit Requirements to identify the required documents for your large meter request. There are different requirements and documents that will need to be provided based on project classification.

What You Need

Review is completed by the Customer Account Services. If the application is accept, and the deposit, if required, is processed and the Inspection team is notified.

Submit Plans in Person

If additional information is required, visit 1002 Washington Ave., 3rd floor.

What You Need

The Inspections team at Customer Account Services will review the job and issue a work order to the plumber via email. When the work is completed, the plumber must schedule an inspection via email. It takes approximately 48 hours for the inspector to take back the meter at the job site.